Fig. 1.
Scatter plot of the “true” rate versus the respective rate estimate for that position. a, Results for the data set of 25 sequences. b, Results for the data set of 100 sequence. For exact simulation conditions see table 1. For values of correlation coefficients and slope of regression line, see table 2. For each of the two data sets, two variants of the estimation method are shown (AP and IP)

Scatter plot of the “true” rate versus the respective rate estimate for that position. a, Results for the data set of 25 sequences. b, Results for the data set of 100 sequence. For exact simulation conditions see table 1. For values of correlation coefficients and slope of regression line, see table 2. For each of the two data sets, two variants of the estimation method are shown (AP and IP)

Close
This Feature Is Available To Subscribers Only

Sign In or Create an Account

Close

This PDF is available to Subscribers Only

View Article Abstract & Purchase Options

For full access to this pdf, sign in to an existing account, or purchase an annual subscription.

Close