References/Year . | Case studies . | Data exchanged . | Technologies used . | Findings . | Evaluation metrics . |
---|---|---|---|---|---|
Zhang et al. (2016) | Pilot study with small-scale game environment | Evacuation time, evacuation route, delay time | Unity, BIM, Cloud computing, Autodesk Revit | Feasibility of large-scale online game for behaviour data collection validated | Evacuation time, route, delay, congestion |
Fritsch et al. (2017) | Testbed Calw, Hermann | Point clouds, FBX, old photos, textures | Trimble SketchUp, Autodesk 3ds Max, Unity | Development of AR/VR apps, high engagement across different age groups | User engagement, data integration efficiency, app performance |
Graebling et al. (2022) | Mont Terri Underground Research Laboratory experiments | Measured and simulated data, research results | Unity, OpenGeoSys, PostgreSQL, Firebird, Python, ParaView | Improved data accessibility, interactive visualizations, enhanced data exploration | User-driven exploration, spatial context embedding, interactive visualizations |
Wei et al. (2021) | 6-floor educational building in Pittsburgh | Semantic information, schedule information | UE, 4D-BIM, Google Deeplab V3, ResNet-101, PSC | Improved scene understanding, reduced labelling effort, robust semantic segmentation | Pixel-wise accuracy |
Lee et al. (2023) | Construction sites with scaffolding, synthetic data generation for worker and PPE detection | BIM data, synthetic images, real-world images, annotations | Unity, CNN models, OpenGL, PyTorch, NVIDIA GPUs | Improved synthetic data detection performance by 30.4%, provided a cost-efficient method for training CV models | Average precision (AP), mean average precision (mAP), F1 score, intersection over union (IoU) |
Binni et al. (2023) | Building construction of the Polytechnic University of Marche | Point clouds, spherical images, IFC | Unity, Autodesk Revit, Leica Cyclone, Ricoh Theta, MySQL | Improved data integration, reduced rework and modelling time, enhanced accuracy of BIM models | Modelling accuracy, time and cost reduction, user feedback |
References/Year . | Case studies . | Data exchanged . | Technologies used . | Findings . | Evaluation metrics . |
---|---|---|---|---|---|
Zhang et al. (2016) | Pilot study with small-scale game environment | Evacuation time, evacuation route, delay time | Unity, BIM, Cloud computing, Autodesk Revit | Feasibility of large-scale online game for behaviour data collection validated | Evacuation time, route, delay, congestion |
Fritsch et al. (2017) | Testbed Calw, Hermann | Point clouds, FBX, old photos, textures | Trimble SketchUp, Autodesk 3ds Max, Unity | Development of AR/VR apps, high engagement across different age groups | User engagement, data integration efficiency, app performance |
Graebling et al. (2022) | Mont Terri Underground Research Laboratory experiments | Measured and simulated data, research results | Unity, OpenGeoSys, PostgreSQL, Firebird, Python, ParaView | Improved data accessibility, interactive visualizations, enhanced data exploration | User-driven exploration, spatial context embedding, interactive visualizations |
Wei et al. (2021) | 6-floor educational building in Pittsburgh | Semantic information, schedule information | UE, 4D-BIM, Google Deeplab V3, ResNet-101, PSC | Improved scene understanding, reduced labelling effort, robust semantic segmentation | Pixel-wise accuracy |
Lee et al. (2023) | Construction sites with scaffolding, synthetic data generation for worker and PPE detection | BIM data, synthetic images, real-world images, annotations | Unity, CNN models, OpenGL, PyTorch, NVIDIA GPUs | Improved synthetic data detection performance by 30.4%, provided a cost-efficient method for training CV models | Average precision (AP), mean average precision (mAP), F1 score, intersection over union (IoU) |
Binni et al. (2023) | Building construction of the Polytechnic University of Marche | Point clouds, spherical images, IFC | Unity, Autodesk Revit, Leica Cyclone, Ricoh Theta, MySQL | Improved data integration, reduced rework and modelling time, enhanced accuracy of BIM models | Modelling accuracy, time and cost reduction, user feedback |
References/Year . | Case studies . | Data exchanged . | Technologies used . | Findings . | Evaluation metrics . |
---|---|---|---|---|---|
Zhang et al. (2016) | Pilot study with small-scale game environment | Evacuation time, evacuation route, delay time | Unity, BIM, Cloud computing, Autodesk Revit | Feasibility of large-scale online game for behaviour data collection validated | Evacuation time, route, delay, congestion |
Fritsch et al. (2017) | Testbed Calw, Hermann | Point clouds, FBX, old photos, textures | Trimble SketchUp, Autodesk 3ds Max, Unity | Development of AR/VR apps, high engagement across different age groups | User engagement, data integration efficiency, app performance |
Graebling et al. (2022) | Mont Terri Underground Research Laboratory experiments | Measured and simulated data, research results | Unity, OpenGeoSys, PostgreSQL, Firebird, Python, ParaView | Improved data accessibility, interactive visualizations, enhanced data exploration | User-driven exploration, spatial context embedding, interactive visualizations |
Wei et al. (2021) | 6-floor educational building in Pittsburgh | Semantic information, schedule information | UE, 4D-BIM, Google Deeplab V3, ResNet-101, PSC | Improved scene understanding, reduced labelling effort, robust semantic segmentation | Pixel-wise accuracy |
Lee et al. (2023) | Construction sites with scaffolding, synthetic data generation for worker and PPE detection | BIM data, synthetic images, real-world images, annotations | Unity, CNN models, OpenGL, PyTorch, NVIDIA GPUs | Improved synthetic data detection performance by 30.4%, provided a cost-efficient method for training CV models | Average precision (AP), mean average precision (mAP), F1 score, intersection over union (IoU) |
Binni et al. (2023) | Building construction of the Polytechnic University of Marche | Point clouds, spherical images, IFC | Unity, Autodesk Revit, Leica Cyclone, Ricoh Theta, MySQL | Improved data integration, reduced rework and modelling time, enhanced accuracy of BIM models | Modelling accuracy, time and cost reduction, user feedback |
References/Year . | Case studies . | Data exchanged . | Technologies used . | Findings . | Evaluation metrics . |
---|---|---|---|---|---|
Zhang et al. (2016) | Pilot study with small-scale game environment | Evacuation time, evacuation route, delay time | Unity, BIM, Cloud computing, Autodesk Revit | Feasibility of large-scale online game for behaviour data collection validated | Evacuation time, route, delay, congestion |
Fritsch et al. (2017) | Testbed Calw, Hermann | Point clouds, FBX, old photos, textures | Trimble SketchUp, Autodesk 3ds Max, Unity | Development of AR/VR apps, high engagement across different age groups | User engagement, data integration efficiency, app performance |
Graebling et al. (2022) | Mont Terri Underground Research Laboratory experiments | Measured and simulated data, research results | Unity, OpenGeoSys, PostgreSQL, Firebird, Python, ParaView | Improved data accessibility, interactive visualizations, enhanced data exploration | User-driven exploration, spatial context embedding, interactive visualizations |
Wei et al. (2021) | 6-floor educational building in Pittsburgh | Semantic information, schedule information | UE, 4D-BIM, Google Deeplab V3, ResNet-101, PSC | Improved scene understanding, reduced labelling effort, robust semantic segmentation | Pixel-wise accuracy |
Lee et al. (2023) | Construction sites with scaffolding, synthetic data generation for worker and PPE detection | BIM data, synthetic images, real-world images, annotations | Unity, CNN models, OpenGL, PyTorch, NVIDIA GPUs | Improved synthetic data detection performance by 30.4%, provided a cost-efficient method for training CV models | Average precision (AP), mean average precision (mAP), F1 score, intersection over union (IoU) |
Binni et al. (2023) | Building construction of the Polytechnic University of Marche | Point clouds, spherical images, IFC | Unity, Autodesk Revit, Leica Cyclone, Ricoh Theta, MySQL | Improved data integration, reduced rework and modelling time, enhanced accuracy of BIM models | Modelling accuracy, time and cost reduction, user feedback |
This PDF is available to Subscribers Only
View Article Abstract & Purchase OptionsFor full access to this pdf, sign in to an existing account, or purchase an annual subscription.