Study, Year (Institution) . | Time horizon . | VRE share* . | Storage capacity** . | System value . | Flexibility options . | Storage options . |
---|---|---|---|---|---|---|
BEIS, 2017 (Government)9 | 2015–2035 | 25–55% 32–62% | 0.007–0.023% 5–18% | - | Storage, Interconnection | - |
BNEF, 2018 (Industry)10 | 2030, 2040 | 43–75% 56–85% | 0.011–0.027% 12–57% | 2% TSC reduction or 0.7 GBP/MWhel (67% VRE, 16.5 GW vs 11.7 GW electricity storage) | OCGT, Storage Interconnection, Hydropower, DSR, Other | Pumped storage, Small-scale batteries, Utility-scale batteries |
Carbon Trust, 2016 (Government)11 | 2020, 2030, 2050 | 25–34% 37–48% | 0.005–0.020% 4–23% | 1.4–2.4 GBPbn p.a. (net) (100gCO2/kWhel target, deployment of flexibility options) | OCGT, Storage Interconnection, DSR | Pumped storage, Bulk storage, Distributed storage |
CCC, 2015 (Government)12 | 2030 | 0–83% 0–75% | 0.004–0.024% 3–20% | 3–3.8 GBPbn p.a. (gross) (100gCO2/kWhel target, deployment of flexibility options) | OCGT, Storage Interconnection, Hydropower | Pumped storage, Other dedicated storage |
Edmunds, 2014 (Academic)13 | 2020–2030 | 16–39% 24–54% | 0.009–0.027% 4–6% | - | Storage, Interconnection, Hydropower | Pumped storage |
Heuberger, 2017 (Academic)2 | 2035 | - 49–60% | - 0–10% | 15% TSC reduction or 515 GBP/kWcap (70 GBP/tCO2, 9.5 GW vs 0 GW electricity storage) | OCGT, Storage Interconnection | Compressed air |
Heuberger, 2018 (Academic)14 | 2015–2050 | 14–76% 27–86% | 0.007–0.023% 5–18% | - | OCGT, Storage Interconnection | Pumped storage, Battery |
National Grid, 2018 (Industry)15 | 2020–2050 | 26–63% 35–74% | 0.007–0.019% 10–38% | - | Storage Interconnection, Hydropower, DSR | Pumped storage, Decentral battery, Grid-scale battery, Fuel cells, Liquid air, Vehicle to grid, Compressed air |
Pfenninger, 2015 (Academic)16 | - | −85% | − 5− 25% | 50–130 GBP/MWhel (90% VRE, scenarios with vs without storage) | OCGT, Storage Interconnection, Hydropower, Tidal | Pumped storage, Grid-scale batteries |
Price, 2018 (Academic)17 | 2050 | 52–87% 68–85% | 0.006–0.024% 6–24% | - | OCGT, Storage Interconnection, | Pumped hydro, Sodium sulphur |
Zeyringer, 2018 (Academic)18 | 2050 | 49, 76% 73, 91% | 0.009, 0.015% 8,14% | - | OCGT, Storage Interconnection | Pumped hydro, Sodium sulphur |
Study, Year (Institution) . | Time horizon . | VRE share* . | Storage capacity** . | System value . | Flexibility options . | Storage options . |
---|---|---|---|---|---|---|
BEIS, 2017 (Government)9 | 2015–2035 | 25–55% 32–62% | 0.007–0.023% 5–18% | - | Storage, Interconnection | - |
BNEF, 2018 (Industry)10 | 2030, 2040 | 43–75% 56–85% | 0.011–0.027% 12–57% | 2% TSC reduction or 0.7 GBP/MWhel (67% VRE, 16.5 GW vs 11.7 GW electricity storage) | OCGT, Storage Interconnection, Hydropower, DSR, Other | Pumped storage, Small-scale batteries, Utility-scale batteries |
Carbon Trust, 2016 (Government)11 | 2020, 2030, 2050 | 25–34% 37–48% | 0.005–0.020% 4–23% | 1.4–2.4 GBPbn p.a. (net) (100gCO2/kWhel target, deployment of flexibility options) | OCGT, Storage Interconnection, DSR | Pumped storage, Bulk storage, Distributed storage |
CCC, 2015 (Government)12 | 2030 | 0–83% 0–75% | 0.004–0.024% 3–20% | 3–3.8 GBPbn p.a. (gross) (100gCO2/kWhel target, deployment of flexibility options) | OCGT, Storage Interconnection, Hydropower | Pumped storage, Other dedicated storage |
Edmunds, 2014 (Academic)13 | 2020–2030 | 16–39% 24–54% | 0.009–0.027% 4–6% | - | Storage, Interconnection, Hydropower | Pumped storage |
Heuberger, 2017 (Academic)2 | 2035 | - 49–60% | - 0–10% | 15% TSC reduction or 515 GBP/kWcap (70 GBP/tCO2, 9.5 GW vs 0 GW electricity storage) | OCGT, Storage Interconnection | Compressed air |
Heuberger, 2018 (Academic)14 | 2015–2050 | 14–76% 27–86% | 0.007–0.023% 5–18% | - | OCGT, Storage Interconnection | Pumped storage, Battery |
National Grid, 2018 (Industry)15 | 2020–2050 | 26–63% 35–74% | 0.007–0.019% 10–38% | - | Storage Interconnection, Hydropower, DSR | Pumped storage, Decentral battery, Grid-scale battery, Fuel cells, Liquid air, Vehicle to grid, Compressed air |
Pfenninger, 2015 (Academic)16 | - | −85% | − 5− 25% | 50–130 GBP/MWhel (90% VRE, scenarios with vs without storage) | OCGT, Storage Interconnection, Hydropower, Tidal | Pumped storage, Grid-scale batteries |
Price, 2018 (Academic)17 | 2050 | 52–87% 68–85% | 0.006–0.024% 6–24% | - | OCGT, Storage Interconnection, | Pumped hydro, Sodium sulphur |
Zeyringer, 2018 (Academic)18 | 2050 | 49, 76% 73, 91% | 0.009, 0.015% 8,14% | - | OCGT, Storage Interconnection | Pumped hydro, Sodium sulphur |
This PDF is available to Subscribers Only